Https://www.cargomaster.com.au/wp-content/uploads/2012/08/img_slider_05-564x350.jpgPredicted import volumes to La through around following three months dependant on carrier manifest details (Chart: The Port of La Signal, run by Port Optimizer) Set all of it alongside one another — the port stats, the ships at anchorage, the proposed GRI timetable — and it raises the issue: http://Conservablogs.com