If important to cross sidewalks, dig the trench right down to the expected depth on either side, then bore a lateral gap under the sidewalk by driving a bit of rigid pipe or conduit horizontally. Then, run the conduit beneath the sidewalk throughout the gap you bored. A conduit program https://rafaelrixma.blogmazing.com/28822324/how-cable-trunking-can-save-you-time-stress-and-money