As observed through the figure beneath, continual auger is utilized to drill the borehole, raise up drilled soil, and pour concrete while the auger is moved up. As a result, the borehole does not need casing or hydrostatic pressure to stop damage to the borehole wall. আমাদের কোম্পানিতে দক্ষ সার্ভেয়াররা https://castinsitupilesindhaka34555.59bloggers.com/33009774/helping-the-others-realize-the-advantages-of-cast-in-situ-piles-in-dhaka