Initially, the Jai Hind metro station was prepared to become elevated. Nevertheless, the AAI objected which the elevated stretch up for the airport could pose a threat to aircraft, so the route was further reworked plus the station was shifted underground, a hundred and fifty m from your Airport terminal developing. https://railway-kolkata56666.loginblogin.com/39322777/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf